Quantcast
Channel: Power management
Viewing all articles
Browse latest Browse all 80865

Forum Post: BQ20Z95 Termination Voltage

$
0
0

Hello,

A colleague of mine (who has now left the company I work for) designed a circuit that used the BQ20Z95 with a BQ24610 as the charger control. The pack I am using is 4 cells in series with a maximum charge voltage of 4.2V per cell (16.8V Pack voltage) and a minimum discharge voltage of 3V per cell (12V pack voltage)

I am trying to set up the BQ20Z95 using the BQ Gas Gauge Evaluation Software and I have followed the steps for bqEASY section, however the software set up my termination voltage to 12V and I want to change this to 13V. I have changed the "Term Voltage" setiing under Gas Gauging within the Data Flash section to 13V however this seems to do nothing.

Am I doing something wrong or have I missed something obvious?

Many thanks,

Jason 


Viewing all articles
Browse latest Browse all 80865

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>